Wall Assemblies for Different Control Layers
Hello GBA,
I am adding 400 SF addition to the back of my house in Oakland, California (Zone 3C). It will be part conditioned space, part unconditioned storage. I have several control layers overlapping, and I am trying to find the most efficient way to do this, but also make sure I don’t have any sandwiches. Please see the attachments for the control layers, which think correct. Please help me come up with the best wall details for these!
Proposed East wall, in to out: 5/8″ drywall, 2×6 studs +NO insulation, 1/2″ CDX (=shear wall), Corru-vent furring strips, Hardie panels, Hardie board (board & batten). Can I just put the siding assembly directly over CDX? Should I waterproof? Air seal?
Please don’t be limited by my assumptions, and tell me the best way to do these assemblies. Also, even if there are best ways to do each of these individual walls, it’s probably efficient to repeat using a product when possible.
Thank you so much!
GBA Detail Library
A collection of one thousand construction details organized by climate and house part
Replies
FYI, I just updated this to be more clear.