Venting in open-face cladding
![](https://secure.gravatar.com/avatar/cbce4b2c9904ae6c3ab97ddf8526a40e?s=52&d=https%3A%2F%2Fimages.greenbuildingadvisor.com%2Fapp%2Favatars%2F200x200%2Fl.png&r=g)
We are completing the exterior cladding for the house, in climate zone 5, Pittsburgh, PA. The cladding is high density fiber cement panel, over 3×1 wood rainscreen, and per manufacture’s instructions, we left 3/8” gaps between panels, in both horizontal and vertical directions. Rainscreen wood is covered with EPDM rubber prior to installing the panels. The instructions also call for leaving 13/16” (2 cm) ventilation gap below the roof, but spot-check inspection shows that some of these gaps were really closer to 1/4” or even less.
Should we worry and do something about this inaccurate installation (that is, remove the panels, cut a 1/2” away, reinstall) or assume that we would be ok, since the warm air can also escape through horizontal 3/8” gaps present within 2-4′ of the roof and therefore the ventilation would be adequate?
GBA Detail Library
A collection of one thousand construction details organized by climate and house part
![](https://www.greenbuildingadvisor.com/app/themes/greenbuildingadvisor/dist/img/modules/detail-library/thumb1.png)
![](https://www.greenbuildingadvisor.com/app/themes/greenbuildingadvisor/dist/img/modules/detail-library/thumb2.png)
Replies
Lucyna,
I wouldn't worry.
Lucyna,
It looks like they have done a really nice job!