Vapor Barrier Termination for Monolithic Slab On Grade

sidekickarchitects | Posted in General Questions on

For a monolithic slab-on-grade, if I run the vapor barrier (Stego Pango) below the slab then down, under, and back up the outside vertical face of the turned-down footing, how/where do I terminate it? Should I bring it all the way up to the bottom of the Zip sheathing and then use Prosoco Seam and Joint Filler to bridge that sill connection? Would the damp-proofing treatment then go outside of the vapor barrier and the slab edge rigid insulation would go outbound of the damp-proofing? What product do folks here like for damp-proofing the outside face of a monolithic slab on grade?

GBA Prime

Join the leading community of building science experts

Become a GBA Prime member and get instant access to the latest developments in green building, research, and reports from the field.

Replies

Log in or create an account to post an answer.

Community

Recent Questions and Replies

  • |
  • |
  • |
  • |