Solar Ready Load Center Pedestal
![](https://secure.gravatar.com/avatar/8a4b09982b184e0b1baf9e8858cfc186?s=52&d=https%3A%2F%2Fimages.greenbuildingadvisor.com%2Fapp%2Favatars%2F200x200%2Fm.png&r=g)
We are looking to add a 19Kw ground mount PV system in the near future. Our electric service has a Midwest Pedestal with meter that we planned to connect to. I checked with Midwest technical support and they said the bus would only support 200 amps and that their was no way to do a line tap without violating UL. They also said they have no other add-on or way to modify the pedestal as it pre-dates solar becoming mainstream. If I have no other options, I am fine to replace it. Does anyone know of a 200 amp solar ready meter pedestal with a few breaker slots? I need to feed a subpanel at the pool from this as well as the main house. Here is what we currently have. https://www.midwestelectric.com/products/service-entrance/pedestal-service-entrance
GBA Detail Library
A collection of one thousand construction details organized by climate and house part
![](https://www.greenbuildingadvisor.com/app/themes/greenbuildingadvisor/dist/img/modules/detail-library/thumb1.png)
![](https://www.greenbuildingadvisor.com/app/themes/greenbuildingadvisor/dist/img/modules/detail-library/thumb2.png)
Replies