GBA Logo horizontal Facebook LinkedIn Email Pinterest Twitter X Instagram YouTube Icon Navigation Search Icon Main Search Icon Video Play Icon Plus Icon Minus Icon Picture icon Hamburger Icon Close Icon Sorted

Community and Q&A

Preparing Subfloor for Cement Tile Installation (Pier and Beam)

TxScrGrl | Posted in General Questions on

Total beginner! Conducting some minor remodeling of a house built in Dallas, Texas in 1970. The entry way had tile on top of a mud bed, which we have removed.  What is remaining is the subfloor, which is shown in the picture.  This seems to be the only place in the house with this sort of subfloor.

What would be the best way to prepare this subfloor for new tile? 

Should the wood planks between the joists be replaced or screwed/nailed down?

Was thinking of (1) securing the planks, (2) adding plywood between the joists, (3) filling in gaps, (4) using a self leveling compound and (5)  installing backerboard or Ditra.

Would love to advice on how this really should be done.

GBA Prime

Join the leading community of building science experts

Become a GBA Prime member and get instant access to the latest developments in green building, research, and reports from the field.

Replies

Log in or create an account to post an answer.

Community

Recent Questions and Replies

  • |
  • |
  • |
  • |