GBA Logo horizontal Facebook LinkedIn Email Pinterest Twitter X Instagram YouTube Icon Navigation Search Icon Main Search Icon Video Play Icon Plus Icon Minus Icon Picture icon Hamburger Icon Close Icon Sorted
Detail Library

S10//Flanged window installation // water managed //housewrap// Step 10

A water-managed window installation properly weatherlaps and integrates the window unit and the rough opening flashings and weather-resistive barrier (WRB). It is appropriate for moderate to high weather exposure. In this 14-step installation series, the window unit goes in before the WRB (housewrap) goes up.

Details that show the complete and final configuration of window installations are fine, but window installation step-by-step series are where the rubber meets the road.

GBA Prime

This article is only available to GBA Prime Members

Sign up for a free trial and get instant access to this article as well as GBA’s complete library of premium articles and construction details.

Start Free Trial

Related

Community

Recent Questions and Replies

  • |
  • |
  • |
  • |