GBA Logo horizontal Facebook LinkedIn Email Pinterest Twitter X Instagram YouTube Icon Navigation Search Icon Main Search Icon Video Play Icon Plus Icon Minus Icon Picture icon Hamburger Icon Close Icon Sorted
Detail Library

Conceptual Line of a Continuous Air Barrier in Lower Wall Section

The simplest way to ensure that all elements of your air barrier system connect up is to take a footing-to-ridge cross section drawing of your building and connect the air barrier from the footing to the ridge without lifting your pencil or cursor. Typically, the tough spots will be transitions from one assembly to another (for example foundation to above-grade wall) and penetrations like windows and dormers. These details are a part of that process, keeping the pencil or cursor flowing from footing to ridge (or top floor ceiling).

GBA Prime

This article is only available to GBA Prime Members

Sign up for a free trial and get instant access to this article as well as GBA’s complete library of premium articles and construction details.

Start Free Trial

Related

Community

Recent Questions and Replies

  • |
  • |
  • |
  • |